Polyurethane Waterproof Coating for High-Speed Rail

2018-11-27 11:55:00
times

feature


1. The product is a two-component product, which is cured by reaction at room temperature. The A component is a transparent liquid, and the B component is a gray viscous paste.


2. High strength, high wear resistance, impact resistance, corrosion resistance.


3. It has excellent waterproof and anti-seepage performance on concrete surface, and it can be used on the facing surface.


4. Does not contain tar, asphalt, solvent, non-toxic, non-polluting, and can be used in drinking water projects.


advantage                             


1. High tensile strength, high elongation, and strong resistance to deformation of the base layer.


2. High bonding strength, wear-resistant, resistant to erosion by media such as mud and sand.


3. Resistance to chemical medium corrosion, aging resistance, high and low temperature resistance.


4. Curing speed is adjustable.


Element                           


A component, polyether polyol, polyisocyanate, additives


B component, curing agent, additives, filler


Recommended for


1. Waterproof and anti-seepage of high-speed railway passenger dedicated line foundation, bridges, tunnels and culverts.


2. Water conservancy and hydropower project dams, reservoirs, water conveyance tunnels, bridges and culverts, etc. are waterproof and anti-seepage.


3. Waterproofing of roofs, basements and sports grounds of important buildings.


4. Waterproof for drinking water pools, swimming pools, and sewage treatment pools.


5. Anti-corrosion treatment of metal equipment and pipelines.


6. Anti-corrosion treatment of wooden boats and metal hulls.


Typical Performance Indicators






construction


1. Base-level preparation: The surface of the base-level should be structurally complete and solid, clean, free of loose debris and oil.


2. Primer: use DM-210 damp base surface sealer, brush evenly, without missing coating. The reference amount of primer is about 8㎡.


3. Standard ingredients: A/B=1/1(W/W), mix the two components and use an electric mixer to stir for more than 3 minutes until they are even and ready for use.


4. After the surface of the primer is dry, use standard ingredients to carry out intermediate coating and surface coating construction. The thickness must meet the design requirements, and the thickness should be ≥ 2mm when used for high-speed railway lines.


5. After the coating is fully cured, the concrete protective layer can be made according to the design requirements.


Reference dosage: the thickness of the coating film is 1mm, and the dosage is about 1.2~1.3kg/m2


Note: The company can be equipped with a special electric mixer.


Precautions


1. The construction temperature should be above 5°C. Fireworks are strictly prohibited at the construction site, and the ventilation is good. It is not suitable for construction in windy or rainy days.


2. Construction personnel should wear work clothes, protective glasses, gloves and other protective equipment to avoid contact between paint and eyes and skin. If it accidentally splashes into the eyes, it should be washed immediately and then consulted a doctor. Safety belts should be worn when working at heights.


3. Before the paint is fully cured, it is forbidden to use people or touch water.


Packaging and storage


This product is packed in iron drum: component A 15kg/barrel, component B 15kg/barrel


0℃~30℃, sealed and stored in a cool and dry warehouse, the shelf life is 12 months


Tags

Recently Viewed:

Related products

news.related_news

Feel free to contact us

  • Service Hotline: 0086-13805256747 Manager Weng
  • Address: Zhongxing Road, Xupu Industrial Concentration Zone, Zhenzhou Town, Yizheng City
  • Tel: 0086-514-83290999 83299352
  • Fax: 0086-514-83299352
  • E-mail:919130896@qq.com